Blueprint vision

Why VLMs Miss Small Objects, and When Zooming In Is Safe

Junzhe Shi and Yuan Gan

arXiv:2610.09313 · Computer Vision

Advancing construction AI through original research in visual perception.

Helping AI see more of the details that matter.

Research co-authored by Quotr’s CTO Junzhe Shi and Head of AI Yuan Gan tackles a fundamental challenge in computer vision: finding small objects in large, detailed images. The study develops a theory-guided approach to image decomposition, giving vision-language models a better way to examine the symbols and details that matter in construction drawings.

Across approximately 187,000 model requests, the research examines 12 vision-language models, including GPT-6.1, Claude Opus 5.5, and Gemini 4. The proposed method delivers up to 126% higher recall with Qwen3-VL on floor-plan mosaics compared with whole-image input, and raises Gemini 3.8’s recall from 62% to 90% on construction drawings.

01 / The research

Preserve the detail. Plan the views.

Sent as a whole image, a legend symbol in the study spans S = 0.40 visual tokens per side. A planned split covers the same sheet with 20 overlapping views at S = 1.5. Orange points mark the annotated targets.

Paper Figure 1(a): a small construction symbol at the whole-image input scale, with its target box and visual-token grid.
Figure 1(a). A small construction symbol at the whole-image input scale. Object scale S = 0.40.
Paper Figure 1(d): a construction drawing divided into 20 overlapping views at S = 1.5, with annotated targets marked.
Figure 1(d). Twenty planned overlapping views at S = 1.5. View boundaries and one highlighted view sit over the annotated targets.

Research at a glance

Model families evaluated: GPT, Claude, Gemini, Gemma, and Qwen. The main results use the paper’s shortened model names. Source: Table 6.

The study spans construction drawings, floor plans, natural images, and controlled synthetic scenes, combining mathematical analysis with large-scale, object-level evaluation.

Small-object recognition results across GPT, Claude, and Gemini

The same models. Better-designed views.

On 34 construction-drawing test images, theory-guided decomposition brings GPT-6.1’s mean recall to approximately 100%, Claude Opus 5.5’s to 92%, and Gemini 4’s to 98%. Recall measures the share of target objects found.

Mean recall on the same 34 images, rounded. Whole-image input versus theory-guided decomposition: GPT-6.1 97% to about 100%; Claude Opus 5.5 83% to 92%; Gemini 4 85% to 98%; Gemini 3.8 62% to 90%; Qwen3-VL 37% to 56%. Source: Table 2.

Mean recall on 34 construction drawings, whole-image input versus theory-guided decomposition, for GPT-6.1, Claude Opus 5.5, Gemini 4, Gemini 3.8, and Qwen3-VL.
Research results from Table 2. Each pair compares the same model on the same 34 construction-drawing test images. Recall percentages are rounded.
  • +126%

    Relative recall

    Qwen3-VL on 60 floor-plan mosaics, versus whole-image input.

  • +73%

    Relative recall

    Gemini 3.8 on the same floor-plan mosaics. Section 6.

  • 62% → 90%

    Gemini 3.8 on drawings

    Construction-drawing recall, whole image to theory-guided views.

Why do vision-language models miss small objects?

Two factors shape what a VLM can find: the detail available to each object and the amount of content one call must handle.

The research captures these factors with object scale (S) and content per call (L). Object scale measures how many visual tokens span an object’s side after image processing. Content per call describes how much the model must search and report at once.

High-resolution inputs, image tiling, and crop-and-zoom agents change these factors in different ways. The paper provides a common framework for understanding those choices and designing how an image reaches the model.

Better models are part of the answer. Better-designed visual inputs are another.

When is image decomposition safe, and what does it cost?

The paper turns image decomposition into a principled design problem.

Under its tested monotonicity conditions, the study establishes a recall-preserving construction: keep each object at least as large in the model’s visual representation as in the whole-image input, and provide target-sized overlap between neighboring views.

The research connects that protection to a minimum token cost and gives an executable rule with an explicit cost bound. A released planning tool calculates the views and token requirements before the first model call.

For researchers working on small-object recognition, high-resolution VLMs, image tiling, visual search, and zoom agents, the contribution is both explanatory and practical: understand what limits recognition, design how a model sees the image, and plan the required compute.

  1. Drawings
  2. Located objects and boundaries
  3. Scaled geometry
  4. Material quantities
  5. Estimates and procurement

One geometric foundation. Counts, lengths, areas, and volumes.

A fixture becomes a count. Connected endpoints and turning points become a measured route. An ordered boundary becomes an area. A footprint, combined with its specified thickness or depth, becomes a volume.

The common foundation is located objects, connected geometry, a calibrated drawing scale, and the dimensions and material specifications that define the work.

AI locates the elements. Geometry turns locations into measurements. Construction rules turn measurements into material quantities.

From one geometric foundation to takeoff across trades

Different trades. One measurable foundation. The examples show how visual recognition connects with drawing geometry, schedules, specifications, and material rules.

  • Devices · Routes · Installation quantities

    Electrical and low-voltage takeoff

    Fixture, receptacle, switch, and data-device locations establish counts by type. Route endpoints and turning points define conduit, cable-tray, and cable pathways. Circuit schedules, risers, conductor counts, and specified installation allowances connect those measurements to material quantities.

    Device counts, conduit and cable lengths, cable-tray runs, and installation assemblies.

  • Walls · Openings · Assemblies

    Drywall, framing, and ceiling takeoff

    Wall endpoints, heights, openings, and board layers define drywall coverage. Stud spacing and wall-type details add framing and insulation quantities. Reflected ceiling plans and specified grid layouts connect ceiling boundaries to tile, grid, perimeter trim, and hanger quantities.

    Board coverage, studs and track, insulation, ceiling tiles, and suspension components.

  • Room boundaries · Finish types · Coverage

    Flooring, tile, and stone takeoff

    Room boundaries define floor areas and perimeters. Finish schedules assign tile, carpet, vinyl, hardwood, or stone to each space. Layout, cuts, product coverage, waste factors, and specified layer thicknesses translate measured surfaces into purchasing quantities.

    Flooring by finish, base and transitions, adhesive coverage, and underlayment quantities.

  • Duct paths · Equipment · Insulation

    HVAC and sheet-metal takeoff

    Duct endpoints, branches, and turns define routes. Size tags and elevations supply dimensions. Equipment and diffuser symbols establish counts. Straight-run geometry, fitting details, and insulation specifications connect those measurements to sheet-metal and insulation quantities.

    Duct lengths by size, fittings, diffusers, equipment counts, and insulation coverage.

  • Fixtures · Pipe routes · Risers

    Plumbing and piping takeoff

    Fixture symbols establish counts. Pipe routes, riser diagrams, and elevations establish horizontal and vertical lengths. System tags, diameters, and connection details organize supply, waste, vent, and specialty piping into distinct material breakdowns.

    Fixture counts, pipe lengths by system and size, fittings, valves, and insulation quantities.

  • Sprinkler heads · Branches · Risers

    Fire-protection takeoff

    Sprinkler-head symbols and equipment tags establish counts from the system drawings. Documented pipe routes, sizes, risers, and installation details organize mains, branch lines, valves, hangers, and related components into quantities for pricing.

    Sprinkler-head counts, pipe lengths, valve assemblies, and specified support components.

  • Footprints · Thicknesses · Reinforcement details

    Concrete, foundations, and rebar takeoff

    Slab boundaries, footing dimensions, and specified depths define concrete volume. Formed faces establish formwork area. Bar schedules, spacing, cover, laps, and bend details connect reinforcement layouts to bar counts, lengths, and weight.

    Concrete volume, formwork area, reinforcement quantities, vapor barriers, and base layers.

  • Roof planes · Edges · Penetrations

    Roofing and waterproofing takeoff

    Roof boundaries, slopes, and elevation details define surface area. Ridges, valleys, parapets, drains, and penetrations add linear and count quantities. Specified roof assemblies, membrane laps, and insulation layers translate the geometry into material requirements.

    Roofing coverage, membrane and insulation quantities, flashing lengths, and drainage components.

  • Surfaces · Finishes · Coating systems

    Painting and coatings takeoff

    Wall lengths, heights, ceiling boundaries, and opening deductions define paintable areas. Finish schedules separate surfaces by coating system. Specified coat counts and manufacturer coverage rates translate those areas into primer and finish quantities.

    Paintable area by finish, primer and coating volumes, and trim lengths.

  • Elevations · Openings · Unit layouts

    Masonry, brick, and block takeoff

    Wall elevations, heights, and openings define net masonry area. Unit dimensions and joint sizes translate coverage into brick or block counts. Specified bond beams, reinforced cells, grout, and lintel details add the materials behind the wall assembly.

    Brick and block counts, veneer coverage, grout quantities, reinforcement, and lintels.

  • Member marks · Lengths · Sections

    Structural-steel takeoff

    Column, beam, and brace locations establish the member list. Member marks connect lengths to section schedules and unit weights. Deck boundaries and documented connection details add decking, plates, anchors, and bolts to the estimating scope.

    Member counts and lengths, calculated steel weight, deck area, and connection components.

  • Opening tags · Schedules · Assemblies

    Doors, windows, and glazing takeoff

    Opening symbols and tags establish counts and connect each location to its schedule. Dimensions, frame types, glazing specifications, and hardware sets turn those openings into organized assemblies. Elevation layouts define storefront and curtain-wall areas and framing runs.

    Doors and frames by type, hardware sets, glazing areas, and storefront components.

  • Surfaces · Elevations · Civil geometry

    Earthwork, sitework, and utility takeoff

    Site boundaries and existing and proposed elevations define grading geometry. Formation levels and pavement build-ups establish excavation and fill requirements. Utility profiles, trench widths, and bedding details add pipe, excavation, bedding, and backfill quantities.

    Cut and fill volumes, paving areas, curb lengths, utility runs, and trench quantities.

  • Existing conditions · Removal limits · Material types

    Demolition and renovation takeoff

    Existing-condition plans and demolition notes identify what stays, moves, or is removed. Wall runs, surface boundaries, and device locations organize removal quantities. Material types, thicknesses, and disposal factors connect that scope to handling and waste estimates.

    Wall and floor removal areas, fixture counts, sawcut lengths, and disposal quantities.

Measure once. Put the geometry to work across scopes.

A room boundary supports flooring and floor preparation. The reflected ceiling plan adds ceiling coverage and grid quantities. Wall lengths, heights, and openings support drywall, insulation, and painting. Located devices connect the same space to electrical and mechanical scope.

A roof outline connects surface coverage, flashings, insulation, and drainage. A foundation footprint connects concrete, formwork, reinforcement, and excavation through the corresponding sections and specifications.

The strategic value is reuse: organize the geometry once, apply the relevant trade rules, and connect the resulting quantities to the estimate.

That is the cross-trade direction behind Quotr’s research: a common visual and geometric foundation, expanded through construction knowledge into the quantities people need to build, price, and buy.

From stronger visual recognition to a more useful estimating workflow

Quotr connects counts and measurements with editable takeoff information, drawing markups, pricing, and proposals. Research-driven development focuses on bringing more of that workflow together: visual recognition, geometry, construction knowledge, and usable estimate line items.

For customers, the intended value is practical: spend less time rebuilding the drawing in a spreadsheet and more time reviewing scope, choosing materials, pricing work, and preparing a bid.

A stronger starting point for quantity review. A clearer connection from drawing detail to estimate detail.

Advancing visual AI beyond construction

The study’s contributions extend to other large, detail-rich images, including documents, screens, maps, and natural scenes. Its code, experimental outputs, and image-decomposition planning tool give researchers and developers resources to inspect, reproduce, and build on.

Construction provides a demanding problem. Original research turns that problem into methods that can inform the wider field of visual AI.

See the detail. Measure the scope. Price the work.

Still have questions?

Talk with our team

Product questions, pricing, or rollout — we'll get back within one business day.

Contact us

Live walkthrough

Book a 30-minute demo

See takeoff, estimates, and bid management tailored to how your team works today.

Schedule demo