Wide banner evoking subcontractor estimating, takeoff, and bidding work.Wide banner evoking subcontractor estimating, takeoff, and bidding work.

Estimate faster, bid smarter

Your entire subcontractor workflow in one platform: takeoff, estimates, database, bids, and procurement—plans from $299.90/month.

How Quotr.ai works for contractors

From plans to priced estimates in one workflow

Quotr.ai for Contractors is subscription software you run in-product—estimates, procurement, and proposal exports stay in your workspace, not through a concierge turnaround.

UploadAI-assisted takeoffPrice & compareProcureProposals

Upload drawings

Bring in PDF plans and keep project versions organized in one workspace.

Run AI-assisted takeoff

Detect rooms, counts, openings, and key symbols—then refine everything with estimator control.

Apply your pricing database

Use the built-in item library or plug in your own labor, assemblies, location-based pricing, and markup rules.

Bid, compare quotes, export

Request supplier pricing, compare responses side by side, and export line items or comparison sheets your team can act on.

Proposals from live estimates

Tie a reusable proposal shell to your working estimate and export a polished PDF—pricing stays synced to the live estimate.

Projects & estimates

One place for every project and estimate

Stop juggling spreadsheets and folders. Quotr.ai gives you a single hub for all projects and estimates, with location-based pricing so numbers stay relevant to where you build. Upload plans, create versions, compare estimates, and watch your running total update as you work — no more surprises at the end.

Project dashboard listing jobs and estimates in one workspace.
Takeoff & editor

Your plans in one place — manual control and AI speed

Work directly on your PDFs: switch pages, use layers to isolate what you need, and draw or measure with familiar tools. When you want to move faster, Quotr.ai's AI can detect rooms, symbols, doors, and windows so you spend less time clicking and more time building. Same quality, less grind.

Plan viewer with markup and takeoff tools on a drawing sheet.
Templates

Rooms that fill in the right items every time

Define a room once and Quotr.ai suggests flooring, doors, hardware, and finishes so you don't rebuild the same list project after project. Use Quotr.ai's defaults or tailor templates to your standards — either way, estimates stay consistent and setup stays minimal.

Room template setup linking assemblies and finishes into line items.
Database

Your pricing, your rules — or Quotr.ai's out of the box

Pull from Quotr.ai's maintained item library or build your own so trade deals and supplier relationships feed straight into your estimates. AI helps you add and categorize items quickly, so your database grows without the busywork. Your private database is stored securely on our servers.

Pricing database view for items, costs, and libraries feeding estimates.
Bids & procurement

From estimate to bids to purchase — without leaving Quotr.ai

Export to Excel or marked-up PDFs, then send quote requests to suppliers from inside the app. When bids come back, compare them side by side. AI surfaces pricing and differences so you can decide fast. Need better numbers? Quotr.ai can connect you with vetted overseas factories for door-to-door pricing and delivery — no tariff or logistics hassle on your desk.

Procurement flow with quote requests and side-by-side supplier responses.
Proposal builder

Proposals from your cost data

AI learns how you lay out proposals, builds a Quotr.ai-compatible template, and routes your estimate into it—export client-ready output without rebuilding the whole deck. Upload a past proposal or bid package and AI maps sections, tables, and placeholders so Quotr.ai can mirror how you already present work to clients. Link the template to your estimate, add the finishing details, and export a polished PDF in seconds: costs pull straight from the project, and the client document stays in sync with your numbers.

Proposal layout wired to live estimate fields before PDF export.
Direct procurement

Factory sourcing without the logistics headache

If you're seeking more competitive pricing, Quotr.ai can also directly connect you with vetted factories in China for door-to-door pricing. You don't have to manage tariffs, logistics, or factory communication. Products are manufactured to your specifications, and you can even video call to review completed items before shipment. Materials are delivered directly to the job site, typically within about 90 days.

Simple, transparent pricing

7-day free trial on every plan. Cancel anytime. No charge if canceled.

Solo

1 seat

$299.90/mo

From $249/seat/mo billed yearly

Takeoff, estimates, bids, database & more

Team

2–6 seats

Popular
$499.90/mo

From $69/seat/mo billed yearly

Takeoff, estimates, bids, database & more

Enterprise

7+ users

Contact sales

Custom pricing

SSO, custom contracts & dedicated support

Contractor FAQ

Contractor Questions

Quick answers contractors ask before switching to Quotr.ai. For broader platform, security, and integration questions, visit the full FAQ.

How does Quotr.ai differ from standard manual subcontractor estimating software?

Traditional subcontractor estimating software relies on tedious, point-and-click manual tracing which slows down your bid pipeline. Quotr.ai leverages cloud-native AI to automatically detect footprints, wall linears, openings, and recurring trade symbols instantly from your uploaded PDFs. You maintain complete manual control to review and modify any layer, cutting down your takeoff-to-proposal time to minutes while eliminating calculation fatigue.

Can I upload full structural, architectural, and MEP blueprints into the AI takeoff tools?

Yes. Quotr.ai handles multi-page vector blueprint sets and organizes them directly inside your secure digital project dashboard. The system's advanced computer vision processes multi-scale sheets effortlessly, allowing specialty subcontractors across electrical, framing, drywall, HVAC, plumbing, and roofing trades to run precise, localized quantity counts without page-setup errors.

Does the platform come with a pre-loaded construction pricing database?

Yes. Quotr.ai features a fully maintained out-of-the-box item library and assembly template database. Contractors can immediately apply location-based pricing and custom waste margins, or securely upload their own custom Excel material and loaded labor items. Your private database grows seamlessly as the AI helps categorize historical supplier agreements and trade rules behind the scenes.

Does this platform support construction procurement software features?

Absolutely. Quotr.ai is natively unified to extend past simple measurements and function as a complete construction procurement software. You can send structured quote requests directly to your regional suppliers, compare incoming bids side by side using AI-powered gap analysis, or utilize our global network to order directly from vetted factories for seamless door-to-door job site deliveries.

Is my proprietary trade pricing database secure on Quotr.ai?

Data security is a non-negotiable standard for our B2B vertical SaaS ecosystem. All custom item catalogs, historical labor rates, bid packages, and custom room assemblies are hosted on securely encrypted, isolated cloud servers. Your company's internal estimation metrics remain entirely private and accessible only to your licensed workspace team members.

Can I customize proposal templates to match my existing brand layout?

Yes. Our intelligent proposal builder scans your previously completed PDF or Excel bids to learn your custom layout conventions, headers, and section rules. It then builds a reusable, dynamic proposal template mapped natively to your live project costs—ensuring that your final client-ready proposal exports automatically sync with your working estimation changes.

Book a demo

See Quotr.ai in action. Schedule a 30-minute walkthrough with our team, and we'll show you takeoff, estimates, and bid management tailored to your workflow.